At AULDEC, we are committed to providing a level like no other for maintenance strategies to help you effectively manage your assets. We understand that every piece of equipment on your site is crucial to the overall success of your facility, regardless of its size.
We offer a unique preventative maintenance scheme to ensure that your assets perform at their best and deliver the desired production output. Our cutting-edge digital tools can monitor your facility and generate real-time reports that can predict equipment failure. This way, you can proactively address potential issues before they arise, saving time, money, and resources.
Preventative maintenance isn’t likely to be achieved if you’re dealing with frequent reactive maintenance shutdowns and not getting the production output you need. Please don’t wait until it’s too late; let AULDEC help you optimise your asset management and ensure your facility runs smoothly and efficiently.
We understand that fast-moving projects often sacrifice quality in order to meet schedules and budgets. However, this trend of prioritising speed over quality is concerning and has been growing noticeably. At AULDEC, one of our key project priorities is completing all construction verification and commissioning systems for our clients. We believe that ensuring high quality is essential for any project to meet the needs of its clients and shareholders.
The best time to mitigate risks to any plant, machine, or asset is at the beginning and near the end of its life. It is crucial to ensure that your system is “ready” to turn on at the outset to ensure longevity and to prevent costly breakdowns later on.
To guarantee successful project management and ensure that your new or upgraded systems and plants will meet your needs, consider contacting AULDEC to assist in the planning of your project’s quality assurance system.
During an inspection of the switchgear, it was discovered that a CT cable had been rubbing against the HV feeder cable.
During a repair of the bus duct, it was discovered that the transformer was not installed level. This misalignment caused stress on the bus duct and contributed to its failure.
AULDEC was contacted to inspect a switchgear failure that caused irrefutable damage. No preventative maintenance had been done.
AUDLEC commissioned the switchgear, but the lack of preservation consideration during construction led to fine dust covering its internals, adding cost and duration to the project.