Auldec has become a trusted name in the industry, and have come to represent a reliable source of high quality service.
SCOPE

 

At the client’s request, AULDEC Solutions performed a thorough assessment of a failed 11kV Main Switchboard. During this assessment, extensive damage was discovered, rendering the board unsalvageable. A collaborative effort made the project’s successful completion possible.

We worked closely with engineers and suppliers to ensure the seamless.....

SCOPE

 

AULDEC Solutions’ commitment to SIEMENS Mobility continues to grow across Australia, providing our experience in managing, installing and commissioning traction power infrastructure.

Offsite, AULDEC Solutions was provided with two switchroom shells. We took possession of all the free-issued equipment. We installed it into the switchrooms, including the.....

SCOPE

 

AULDEC Solutions had been referred to APLNG ConocoPhillips by GLNG Santos for their meticulous devotion to the installations of resin-encapsulated bus ducts, testing & commissioning and for the deconstruction & repairs of existing bus duct installations.

Two separate outdoor installations of resin-encapsulated bus ducts had failed at the Curtis.....

SCOPE

 

The GLNG Santos upstream facility had three failed joint sections on a parallel 4000A 400V resin-encapsulated bus duct system that required installation and repair. To install the new bus duct, six joints and three bus duct sections had to be deconstructed and replaced.

It’s crucial to deconstruct the jointing plates with utmost care as the bus duct.....

SCOPE

 

IMPERIUM Engineering approached AULDEC Solutions to provide their skills and experience to assist with completing the Japal Village HV Substation and HV reticulation system for the McNally Group.

Within the scope, AULDEC completed a Quality Assurance review of all works and systems and created a detailed project execution report for the McNally Group to.....

SCOPE

 

AULDEC Solutions provided their services to Anglo Gold Ashanti at Tropicana Gold Mine to carry out the installation and testing of underground mining substations and HV cabling.

Over 1.8km of 3 core 185mm² HV cable was installed in the mine to the 3MVA and 2MVA skid-mounted substations. Transportation, installation, and pre-commissioning of the 3.....

SCOPE

 

AULDEC provided their services to SIMPEC to complete the HV termination and testing of the brand-new camp facility built at the Eliwana site.

Completed within the scope was the HV testing of the 6 11kV-433V 1500kVA Transformers and ABB Safeplus RMU’s, testing of the Distribution Schneider SF6 RMU, earth testing of the HV reticulation system, 15 HV.....

SCOPE

 

Engaged by Schneider Solar as their CSP, AULDEC provided their Services of Project Management and skilled resources for the QA assemble offsite and construction onsite of the 52 Inverter Stations.

The scope included all interconnections between Inverter A & B, final commissioning, testing the entire HV & LV system, and connecting the HV terminations......

SCOPE

 

Engaged by Schneider Solar as their CSP, AULDEC provided their Services of Project Management for the execution of the 32 Inverter Stations installed onsite.

The scope included all interconnections between Inverter A & B, final commissioning, testing the entire HV & LV system, and then connecting the HV terminations.

The immense difficulties.....

SCOPE

 

Engaged by Schneider Solar as their CSP, Auldec provided their Services of Project Management and skilled labour resources for the execution of the 45 Inverter Stations installed onsite.

The scope included completing all interconnections between Inverter A & B, final commissioning, testing the entire HV & LV system, and connecting the HV.....