SCOPE
AULDEC Solutions’ commitment to SIEMENS Mobility continues to grow across Australia, providing our experience in managing, installing and commissioning traction power infrastructure.
Offsite, AULDEC Solutions was provided with two switchroom shells. We took possession of all the free-issued equipment. We installed it into the switchrooms, including the 25KV ASG25 Switchgear, associated control equipment, and the 400V LVAC Switchboard. We completed all equipment interconnection and interpanel wiring.
Onsite, AULDEC completed the final Site Acceptance Testing of all the equipment within the 25kV Switchrooms at Marshall Road and the Track Side Cabin, including the Switchyards 132kV Circuit Breaker and VT/CTs.
Upon completing all the quality assurance documents implemented and executed by AULDEC, AULDEC completed energising all the power, control, and protection systems and successfully commissioned the system on behalf of SIEMENS.