SCOPE

 

AULDEC Solutions had been referred to APLNG ConocoPhillips by GLNG Santos for their meticulous devotion to the installations of resin-encapsulated bus ducts, testing & commissioning and for the deconstruction & repairs of existing bus duct installations.

Two separate outdoor installations of resin-encapsulated bus ducts had failed at the Curtis.....

SCOPE

 

The GLNG Santos upstream facility had three failed joint sections on a parallel 4000A 400V resin-encapsulated bus duct system that required installation and repair. To install the new bus duct, six joints and three bus duct sections had to be deconstructed and replaced.

It’s crucial to deconstruct the jointing plates with utmost care as the bus duct.....

SCOPE

 

The Wheatstone Project “Upstream Scope” included 60t of Busduct and installation and testing of MV/LV Switchgear. This was all completed on the 225m tall offshore facility during its fabrication in South Korea. This platform was then transported to Australia to supply dehydrated gas and dewatered condensate to the onshore facilities at Ashburton.....