SCOPE

 

This project was not just a simple upgrade. It combined multiple Timber Mills within the area and their plant, then relocated it all to the Greenbushes Timber Mill to provide a complete package of greenwood processing and dry wood processing and jointing machines.

All new equipment brought to the Mill had to be inspected, tested, and upgraded to ensure it.....

RRSF_crane
SCOPE

 

AULDEC can provide its services anywhere in Australia, even under complex constraints, and this project did just that!

Engaged by Schneider Electric Solar, Auldec provided Project Management and experience in the change out of all 52 transformers on-site; the scope included all site logistics and cranage interfacing within a tight outage.....

SCOPE

 

AULDEC Solutions provided Project Management, Experience and Skillset in refurbishing and upgrading 4 existing Trackside Switchrooms between Epping and Macquarie Park.

AULDEC completed this scope of works within a tight network outage timeframe staged of 12 months. Within this time frame, Auldec completed the upgrade of the 750V to a 1500V DC protection and.....

SCOPE

 

Installation and pre-commission of over 280 panels of High Voltage equipment for Siemens Mobility on the Sydney Metro Northwest Rail project.

The work involved a fit-out of 7 Traction Substation Switchrooms built offsite in Newcastle then pre-commissioned before their delivery to the site. On-site carry over works leads to installing 2 Traction Transformers.....

SCOPE

 

In 2011 Ernest Henry Mine transitioned from an open pit to an underground and magnetite processing mine. AULDEC was engaged in installing the Electrical and Instrumentation at the 1325 dewatering system that would remove underground mine water and would be capable of handling emergency inflows.

Underground projects can be timely and inefficient, but Auldec.....

SCOPE

 

The Wheatstone Project “Upstream Scope” included 60t of Busduct and installation and testing of MV/LV Switchgear. This was all completed on the 225m tall offshore facility during its fabrication in South Korea. This platform was then transported to Australia to supply dehydrated gas and dewatered condensate to the onshore facilities at Ashburton.....

WP-PerthCBD-Breaker
WP-PerthCBD-Busbar
WP-PerthCBD-Busbar_long
WP-PerthCBD-Terminations_2
WP-PerthCBD-Terminations
WP-PerthCBD-Install
SCOPE

 

AULDEC Solutions as Schneider Electrics CSP completed a major refurbishment of the Perth CBD HV Distribution on the Corner of Milligan and Hay Street, including all onsite Project Management, Construction, and Commissioning activities.

Going into the lead up to this project, it took a great deal of project management skills and preparation to conduct and.....

SCOPE

 

AULDEC Solutions were engaged by Schneider Electric’s at Tianjin, China, to support fabrication, delivery, and installation of 14 switch rooms and the distribution, variable speed drives, uninterruptible power supplies, DC battery chargers and cooling equipment, transformers, distribution boards and power management system.

The total.....

Snowtown-Stage-1-Windfarm-1
Snowtown-Stage-2-Windfarm
Windfarm4
SCOPE

 

Renewable energy is a vital part of our companies’ origins, and at Snowtown Wind Farm, AULDEC assisted in creating a better future for all.

With a highly experienced team, AULDEC delivered the terminations of the 33kV HV reticulation system; this included the termination of 90 Siemens Wind Turbines, 80 inline joints, 50 Ring Main Units and.....

SCOPE

 

Engaged by Schneider Solar as their CSP, Auldec provided their Services of Project Management and skilled labour resources for the execution of the 27 Inverter Stations installed onsite.

The scope included installing the 2-part skid into its final position and completing all interconnections between Inverter A & B, final commissioning, testing the entire.....